Description
We believe that the most fool-proof and safest way to establish the air gap is the jack-up or lift-slab method. Plastic sheeting is placed on the sub-floor as a breaker layer, isolators are placed on the plastic sheeting, reinforcing steel or mesh rests on the isolator housings, and the concrete floor is poured. After the concrete has cured, the slab is lifted to elevation by turning adjustment bolts above each isolator to any specified air gap between 1” and 4”.
TYPE SIZE RATED CAPACITY (VERT.) RATED CAPACITY (HORIZ.)
SFFS 3 5520 lbs/ 2512 kg 7750 lbs / 3527 kg
SFFS 4 5520 lbs/ 2512 kg 7750 lbs / 3527 kg
SFFS 5 5520 lbs/ 2512 kg 7750 lbs / 3527 kg
SFFS 6 5520 lbs/ 2512 kg 7750 lbs / 3527 kg
SFFS 8 5520 lbs/ 2512 kg 7750 lbs / 3527 kg
Buyer Notice
1. About the product
Due to market fluctuations, exchange rate changes, and other factors, product prices and product attributes are for reference only; The specific product requirements are subject to customer requirements, and the price is based on the communicated quotation. All product prices on this website are not considered transaction prices and are for reference only!
2. About Trademark Copyright
All company names, trademarks, logos, product images, product descriptions, product brand names, and trademark copyrights related to this website belong to the corresponding brands; This website is only designed for the convenience of product identification.
Please carefully read the buyer’s instructions to avoid unnecessary disputes.
Reviews
There are no reviews yet.